![]() |
Polar Radar for Ice Sheet Measurements |
||
![]() |
|
Home>PRISM Update>Robotics Team- Loading the Rover | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Loading the RoverClicking on the thumbnails below will allow you to see a larger image. |
||||
Here is the view from inside of the shop looking at the front of the rover. We are getting ready to load it onto a truck so it can be transported. |
The rover was so heavy that we had to have a forklift carry it out of the building. The rover is actually under the blue tarp. |
|||
The forklift was able to get the rover picked up and we were very nervous, because it was raining very lightly and everything was very slippery. |
The forklift had to back up and turn around to place the rover on the truck. |
|||
Here is the truck that the rover was getting put on. As you can tell we were all a little nervous. |
There wasn't a lot of spare room while loading the rover into the truck. |
|||
Very slowly we were able to get the rover further into the truck |
The forklift finally set the rover down inside the truck. |
|||
The forklift then backed out of the truck and it was our turn to help secure it. |
Here is a final shot of the rover in the truck before it was shipped. |
|||
|
||||
PRISM © 2002, 2003 is brought to you by
|
||||